I think this may happen fast, now that we have a system worked out. Thank you Jeff Goodell of Carver Construction! We are actually getting the figures up with the help of Gorilla Glue and power tools!
See the gallery for a few pictures of the first figures going up. I have to say that it looks even better than I could have hoped. The lighting is good, the rough concrete behind the figure shapes is a great contrast and the two different distances from the way and the overlap is working.
Wow.
Plus just walking around the brand spanking new school is a lift. The open spaces, beautiful surfaces, great classrooms, swirling patterns in the floor, and the wonderful boulders and approach to the school entrance.